What Are The Precautions For Environmental Protection Acceptance For Construction Projects Involving The Renovation Of Old Barrels?
2. On-site investigation
①Contrasting with the EIA report and approval documents, verify on-site whether the actual construction content, production scale, production process, product plan, raw and auxiliary materials, production equipment, site selection, and number of personnel of the project are consistent with the EIA, and whether the layout of the plant is consistent; Changes should be analyzed whether they constitute major changes, and if not involved, the reasons for the changes and the circumstances of the changes should also be recorded.
②Waste water, waste gas, solid waste production link, production volume, whether the specific pollutants have changed; whether the pollution prevention measures are consistent, what are the changes, whether the prevention measures are accepted and the test operation analysis is up to the standard discharge (at the same time record the points that need to be monitored and the pollution ); Whether the size, location, storage volume, and usage of the temporary solid waste storage facilities are consistent with the environmental assessment.
③For projects involving hazardous waste, hazardous waste should be more detailed: first, whether the production link, amount and type of hazardous waste are consistent with the environmental assessment, whether there are omissions in the environmental assessment; whether the capacity of the hazardous waste storage site (facility) is Meet the storage and turnover requirements of hazardous waste generation.
Hazardous waste prevention and control measures: Whether the construction area and location of the temporary storage room for hazardous waste meet the requirements, and whether the construction of the temporary storage room meets the "Hazardous Waste Storage Pollution Control Standard" (GB 18597-2001) and the relevant requirements in the standard amendment. See below for specific requirements.
Short comment: Xuheng also provides leak lock plug for refurbishing old barrels. If you have purchase requirements, please contact us.
Indian Scrap Market Is Stable And Expected To RiseJuly 1, 2022Indian imported scrap prices have remained stable on-week on the back of limited buying interest from the mills.UK-origin and US-origin shredded scrap offers have firmed at $525-530/tonne CFR Nhava Sh...view
Zhang Lifeng: Revitalizing Waste Steel DrumsJune 30, 2022How will iron drums and plastic drums containing industrial raw materials and chemical agents be handled? In the past, such waste barrels were generally no longer reused, which not only caused waste, ...view
The Process of the Drum flangeMay 26, 2023The production process is mainly divided into forging, casting, cutting, rolling these four kinds. (1) Casting flange and forging flangeCasting out of the flange, blank shape size is accurate, process...view
Classification and Process Flow of Steel DrumsJune 30, 2023The steel drum is one of the traditional containers and occupies a very important position in the traditional containers. The function of steel drums has evolved from temporary storage of contents to ...view